Hotel FF&E from one supplier
Custom hotel furniture, drawn and made in our own factory in Turkey, with the rest of the room’s list sourced alongside it.
El Ajou Hotel Apartments · Riyadh
What goes on the list
A real room list, from a delivered job in Jeddah. FF&E procurement starts here: room by room, item by item.
Beds and headboards
King and single beds, bed bases and back panels.
Casegoods
Nightstands, dressing tables, wardrobes, minibar units, luggage racks, TV panels and units.
Seating
Sofas, armchairs, chairs and pouffes in the fabric you specify.
Tables
Coffee, side and dining tables, in wood or with marble tops.
The rest of the room
Reading and table lamps, rugs, artwork and wall covering.
Before production
Site measurements, shop drawings and samples for your approval.
FF&E on record
Moonlight Hotel
37 keys: 18 studios, 17 suites and 2 royal suites. Bravo drew, sampled, made and packed the furniture. Three containers left for Jeddah, the last in August 2025. The owner handled freight and assembly.

Citadines Maslak · Istanbul Citadines Maslak
Wooden furniture for the standard and loft floors of this Ascott apartment hotel. Contract January 2024, shipment and assembly from April to June 2024.
Ascott: Citadines Maslak Istanbul
El Ajou Hotel Apartments · Riyadh El Ajou Hotel Apartments
FF&E for a hotel-apartment job in the Al Murabba district. Seven shipments left between September and October 2023.

Holiday Inn Riyadh Rose Yard · mock-up room, Sept 2025 Holiday Inn Riyadh Rose Yard
Mock-up rooms were reviewed on site in September 2025. Bravo is now under contract for the ground, first and second floors and the roof, and in production.
IHG announcement
More FF&E projects

Furniture and joinery for the guest rooms, corridors and lobby, with carpets, lighting, artwork and wall finishes.
Independent hotelFurniture, acoustic doors, wall coverings and lighting for a boutique city hotel in Istanbul.
- Independent hotel
Guest-room joinery, wall coverings, doors and lighting for a hotel in Madinah.
Furniture for guest rooms, corridors and public areas, with lighting and wall finishes.
Furniture and joinery for guest rooms and public areas.
- Hotel apartments
Fit-out and furniture for 1+1 hotel apartments and corridors in Riyadh.
Common questions
- What does an FF&E supplier do on a hotel project?
- It turns the design into a priced room-by-room list, draws each item, makes or sources it, and packs it for the site. Bravo makes the furniture and joinery in Turkey and sources items such as lamps, rugs and artwork alongside.
- Can we buy ex-factory and handle freight ourselves?
- Yes. On Moonlight Hotel in Jeddah the owner handled freight and assembly. We also quote supply with installation, so you can compare the two.
- Do you build a mock-up room first?
- Yes, when the project or the brand asks for one. See the brand-standard hotels page for the record.
- Brand-standard hotels
- How does furniture reach Saudi Arabia?
- The importer registers the goods on SABER and gets a Shipment Certificate for each consignment. Regulated products also need a Product Certificate of Conformity. Our sourcing guide sets out the steps.
- Sourcing routes guide
- What drives hotel FF&E cost per room?
- Hotel type and brand standard first. HVS’s 2026 survey of US budgets shows median FF&E from about US$16,000 per room at limited-service hotels to about US$138,000 at luxury. Its 2023 GCC indication, which also includes operating supplies, runs from US$16,000 per key at midscale to US$86,100 at luxury resorts. HVS says GCC figures depend more on brand standards and procurement contracts than on geography. Scope, freight, duty and VAT then move a quote. These are published figures, not Bravo prices.
- FF&E cost per room guide
- How long does hotel FF&E take?
- Published figures cover stages, not the whole job: 4-6 months for a model room (Cayuga Hospitality Consultants, December 2024), 8-20 weeks to make most contract furniture and joinery (Zigaflow, July 2026), and 6-12 days at sea from Turkey to Jeddah (Turkon schedule, March 2026). These are not Bravo’s lead times. Ask us for dates on your job.
- FF&E lead times guide
Start your next project
Send us your brief, drawings or a Pinterest board. We come back within 48 hours with a costed proposal and indicative lead times.