

Furniture for brand-standard hotels
A new flag or a property improvement plan means a room that passes inspection. Bravo draws it, builds it and shows you the room.
Hilton Dammam Airport · mock-up room, 25 May 2024
From drawing to inspected room
Drawing, board, mock-up, inspection, then the rooms. These frames are from Bravo’s own files.

Hilton Garden Inn Jeddah · shop drawing A3-FF.8 Drawing
Shop drawings with sections, materials and fixings, drawn for approval.

Hilton Dammam Airport · material board, Dec 2023 Board
Leather, brass, marble and fabric samples, together on one board.

Hilton Dammam Airport · mock-up room, 25 May 2024 Mock-up
One real room, with the real furniture and finishes.

Hilton Dammam Airport · mock-up room, 25 May 2024 Inspection
The brand or its consultant checks the room against the standard, line by line.
Hilton, IHG and Ascott work
A mock-up is a sample room built for the brand or its consultant to inspect. It is not the furnished hotel.

Hilton Dammam Airport · mock-up room, 25 May 2024 Hilton Dammam Airport
Bravo made the furniture for a twin mock-up room at this 273-key hotel. Hilton inspected the mock-up rooms on 29 May 2024 and scored them 161 of 166.
Hilton: signing of Hilton Dammam Airport
DoubleTree by Hilton Jeddah · mock-up room, Oct 2023 DoubleTree by Hilton Jeddah
Shop drawings in May 2023, then the furniture for a mock-up room. The design consultant inspected the mock-up rooms in September 2023.
Hilton’s Al Salamah announcement
Hilton Garden Inn Jeddah · mock-up room Hilton Garden Inn Jeddah Al Nuzhah
Drawings and furniture for a king mock-up room in 2024: quilted-leather headboard, oak joinery and a mesh-door wardrobe.
Hilton Garden Inn Jeddah Falastin
One control room, made in Turkey and invoiced in January 2026.
Hilton: Hilton Garden Inn Jeddah Falastin
Holiday Inn Riyadh Rose Yard · mock-up room, Sept 2025 Holiday Inn Riyadh Rose Yard
Mock-up rooms were reviewed on site in September 2025. Bravo is now under contract for the ground, first and second floors and the roof, and in production.
IHG announcement
Citadines Maslak · Istanbul Citadines Maslak
Wooden furniture for the standard and loft floors of this Ascott apartment hotel. Contract January 2024, shipment and assembly from April to June 2024.
Ascott: Citadines Maslak Istanbul
More branded projects

Furniture and joinery for the guest rooms, corridors and lobby, with carpets, lighting, artwork and wall finishes.
Furniture for guest rooms, corridors and public areas, with lighting and wall finishes.
Furniture and joinery for guest rooms and public areas.
Common questions
- Who approves the furniture on a branded hotel?
- The brand or its consultant inspects the mock-up room against its standard, for that hotel. Each project gets its own review.
- What do you need from us to start?
- The brand’s or designer’s design package and the room types. We draw from those, then submit shop drawings and samples for approval.
- How long does a mock-up room take?
- Charis Atwood of Cayuga Hospitality Consultants puts building, buying and installing model rooms at 4-6 months, early enough to allow changes before large orders. That is one consultant’s published figure, not Bravo’s time on your job.
- Mock-up room guide
Start your next project
Send us your brief, drawings or a Pinterest board. We come back within 48 hours with a costed proposal and indicative lead times.

