
Turnkey fit-out
Furniture, joinery, wall panels and doors from one team, for a new hotel or a renovation. The contract sets where our scope stops.
Holiday Inn Riyadh Rose Yard · mock-up room, Sept 2025
Set the scope per contract
Three recent jobs, three different lines between our work and the site’s.
Floors and public areas
Holiday Inn Riyadh Rose Yard: ground, first and second floors and the roof under one contract, in production.
Furniture with shipment and assembly
Citadines Maslak, Istanbul: wooden furniture for the standard and loft floors, with shipment and assembly from April to June 2024.
Made and packed, owner installs
Moonlight Hotel, Jeddah: drawn, sampled, made and packed by Bravo. The owner handled freight and assembly.
The record

Holiday Inn Riyadh Rose Yard · mock-up room, Sept 2025 Holiday Inn Riyadh Rose Yard
Mock-up rooms were reviewed on site in September 2025. Bravo is now under contract for the ground, first and second floors and the roof, and in production.
IHG announcement
Citadines Maslak · Istanbul Citadines Maslak
Wooden furniture for the standard and loft floors of this Ascott apartment hotel. Contract January 2024, shipment and assembly from April to June 2024.
Ascott: Citadines Maslak IstanbulMoonlight Hotel
37 keys: 18 studios, 17 suites and 2 royal suites. Bravo drew, sampled, made and packed the furniture. Three containers left for Jeddah, the last in August 2025. The owner handled freight and assembly.
More fit-out projects
- Hotel apartments
Fit-out and furniture for 1+1 hotel apartments and corridors in Riyadh.

Furniture and joinery for the guest rooms, corridors and lobby, with carpets, lighting, artwork and wall finishes.
Independent hotelFurniture, acoustic doors, wall coverings and lighting for a boutique city hotel in Istanbul.

Furniture, doors, lighting and wall finishes for 2+1 apartments.
Common questions
- Do you work for owners or for contractors?
- Both. Some jobs are direct with the owner and others run through a fit-out contractor.
- Can you work on a hotel renovation?
- Yes. Tell us which floors stay open and what comes out. We measure on site and draw to what is really there.
- What delays a hotel fit-out?
- A 2023 HVS and Wood Couture report names fire and life safety and FF&E in the early stages as a primary cause of delay on GCC hotel projects. It blames incomplete design briefs, repeated revisions, and programmes not updated for changed lead times.
- FF&E lead times guide
Start your next project
Send us your brief, drawings or a Pinterest board. We come back within 48 hours with a costed proposal and indicative lead times.

