Hotel furniture for Kenya
Sofa sets, doors and wardrobes from our factory in Turkey for Nairobi in 2022 and 2023, and what a Kenyan hotel needs to import its furniture.
Key facts
- June 2022: a container of upholstered sofa sets for Nairobi, cleared for export from Turkey.
- 2022 to 2023: doors and wardrobes for an apartment project in Kenya.
- Divine Hotel, Nairobi: furniture designs for the hotel apartments, public areas and corridors.
- Kenya’s branded pipeline: 35 hotels and 6,190 rooms, 79.5% of them on site (W Hospitality Group, March 2026).
- AFCON 2027: 19 June to 17 July, with matches in Nairobi (CAF, 2026).
Made for Kenya
Sofa sets for Kenya
A container of three-, two- and one-seat upholstered sets in several colours, cleared for export from Turkey in June 2022.
Apartment project, Kenya
Doors and wardrobes for an apartment project, 2022 to 2023.
Hotel projects
Furniture designs in 3D for the hotel apartments, public areas and corridors.
Importing into Kenya
Rules as read in November 2026. Check each tariff line with your clearing agent before you order.
45% duty
Kenya’s rate on selected furniture lines from 9403.10 to 9403.70, for one year from 1 July 2026. The EAC rate it replaces is 35%.
Hotel-logo exemption
Furniture marked with a licensed hotel’s logo and imported for its own use can enter free of duty, on application through the Tourism Regulatory Authority.
PVoC
Regulated goods need a Certificate of Conformity from an inspection company appointed by KEBS before they ship. The current contracts began on 19 February 2026.
16% VAT
Charged on the CIF value plus duty and other taxes, with a 3.5% import declaration fee and a 2% railway development levy.
Common questions
- What duty does hotel furniture pay in Kenya?
- Most furniture under heading 9403 is in the EAC’s 35% band, and seats under 9401 in the 25% band (EAC Common External Tariff, 2022 version). From 1 July 2026, for one year, Kenya applies 45% to selected furniture lines from 9403.10 to 9403.70 (EAC Gazette, 30 June 2026). VAT is 16% on the CIF value plus duty, with a 3.5% import declaration fee and a 2% railway development levy (US Commercial Service). Ask your clearing agent for each line.
- Turkey to Africa: buyer’s guide
- Can a hotel in East Africa import its furniture free of duty?
- It can apply. Under the EAC Customs Management Act, Fifth Schedule, Part B, item 21, furniture, carpets, linen and curtains marked with the hotel’s logo and imported by a licensed hotel for its own use are exempt from duty. In Kenya the hotel applies through the Tourism Regulatory Authority with the item list, the bill of lading in the hotel’s name and its tourism licence (TRA guidance, May 2025). The logo has to be on every piece, so agree it with your supplier before production.
- Turkey to Africa: buyer’s guide
- What is PVoC?
- Pre-export verification of conformity. KEBS, Kenya’s standards body, appoints inspection companies that check regulated goods before they ship and issue a Certificate of Conformity for each consignment. Its contracts with nine companies began on 19 February 2026, and shipments from their zones have needed a certificate since 1 March 2026 (People Daily, February 2026).
- Turkey to Africa: buyer’s guide
- Which port, and how long from Turkey?
- Mombasa. The schedules we read show no direct service from Turkey, so a box changes ship at a hub. One schedule search shows about 37 days from Mersin to Mombasa with one transfer, sailing every two to four weeks (Fluent Cargo, read 21 November 2026). Ask a forwarder for current dates.
- Which hotels is AFCON 2027 bringing on?
- The Africa Cup of Nations runs from 19 June to 17 July 2027 in Kenya, Tanzania and Uganda (CAF, May 2026), with matches in Nairobi, Dar es Salaam, Arusha, Zanzibar, Kampala and Hoima (CAF, November 2026). W Hospitality Group’s 2026 report puts 79.5% of Kenya’s pipeline rooms and 77.5% of Tanzania’s on site, the stage when a hotel’s furniture is drawn and ordered.
- Kenya projects
Start your next project
Send us your brief, drawings or a Pinterest board. We come back within 48 hours with a costed proposal and indicative lead times.